Valley Automation
  • Services
    • Discrete Controls
    • Process Controls
    • Water & Wastewater
    • Information Technology
    • Systems Engineering
    • Control Panel Fabrication & Technical Support
    • Structured Cabling
    • Security Cameras & Access Controls
  • About
    • Company Info
    • Overview
    • Careers
    • Mentorship Program
    • Our Team
    • Announcements
    • Success Stories
  • Projects
    • Frederick Water Pump Station
    • City of Radford - Remote Terminal Units
    • Town of Woodstock WTP
  • Partners
  • Contact
  • Frederick Water Pump Station
  • City of Radford - Remote Terminal Units
  • Town of Woodstock WTP

Projects

Recently, we completed an upgrade to a sewage pump station for a local municipality in the Shenandoah Valley. This project showcased many of our technical disciplines such as UL508A certification, electrical installation, engineering and software development offering a turnkey solution to our client.

This installation included demolition of existing electrical and control equipment from previous operations. Our electrical staff installed new Schneider Electric soft starts, a SCADA panel housing Rockwell Automation solutions and Ignition software as the user interface. The pump station is connected via cellular modem for centralized SCADA monitoring control of the complete municipal system. Congratulations to Christopher Smith and Ben Brown for taking the lead on this successful and timely completed project!

Luray Office

1316 East Main Street
Luray, VA 22835
(540) 743.7772

Harrisonburg Office

3221 Peoples Dr., Ste 160
Harrisonburg, VA 22801
(540) 433.3555

Winchester Office

168 Garber Lane
Winchester, VA 22602
(540) 773.0010

Richmond Office

301 Concourse Blvd, Ste 110
Glen Allen, VA 23059
(540) 743.7772

Contact Us

Careers

  • © 2025 Valley Automation. All Rights Reserved.

  • Powered by SoSimple