Recently, we completed an upgrade to a sewage pump station for a local municipality in the Shenandoah Valley. This project showcased many of our technical disciplines such as UL508A certification, electrical installation, engineering and software development offering a turnkey solution to our client.
This installation included demolition of existing electrical and control equipment from previous operations. Our electrical staff installed new Schneider Electric soft starts, a SCADA panel housing Rockwell Automation solutions and Ignition software as the user interface. The pump station is connected via cellular modem for centralized SCADA monitoring control of the complete municipal system. Congratulations to Christopher Smith and Ben Brown for taking the lead on this successful and timely completed project!